Month: June 2016

Plumbing is Done

June 28, 2016   Hours spent building to date:  2,665 Between work for the Connecticut River Museum, the WoodenBoat Show and a fantastic lecture at Mystic Seaport Museum on the great Polynesian navigators, I haven’t clocked that many hours on the Tardis, but I did manage to finish all the plumbing. The plumbing stretched out longer

Read More

This and That

June 20, 2016  Hours spent building to date:  2,641 I don’t know whether I’m sandwiching the Tardis in between other projects or the other projects between the Tardis, but a lot is getting done on all fronts. —  I had some dental appointments that meant I couldn’t get epoxy-coated last week, so I started some light

Read More

On Second Thought…(Resent)

WordPress decided to get rid of all the spacing in my last post, which made it very tough to read. After a couple hours in HTML land I was able to fix it.  Here is a link to the new version: https://mvtardis.com/2016/06/11/on-second-thought/ PK  

On Second Thought…

June 11, 2016  Hours spent building to date:  2,607 I have received a lot of comments from followers and shop visitors  on my  last post regarding my plan to get Tardis in the water this fall, no matter what.  Most of them have been along the lines of, “Are you nuts?” especially when they realized that

Read More