November 23, 2014 Hours spent building to date: 372 Ray came over and we laminated the port stringers and aft sheer clamp in record time. I had hoped to have the ready for planking (or sheathing I guess is more accurate) by Thanksgiving, but the forward part of the sheer clamp still has to
Topside Stringers
November 20, 2014 Hours spent building to date: 363 With fairing finished, time to return to some real boatbuilding — which in turn led to more fairing. The topside stringers are the long, thin members that provide a bonding surface for the topside planking. They are curved for roughly the forward 15 feet of the
Motor Mount
November 15, 2014 Hours spent building to date: 338 The engine mount is attached to two more heavy stringers that run about five feet in from the transom and form the sides of the motor well. They are 3/4-inch plywood, so the well assembly is 1 1/2-inches thick — pretty hefty to handle the
Routine Day
November 7, 2014 Hours spent building to date: 326 Nothing big to report — just a lot of the small jobs that lead to a big boat. And a few tidbits for the followers that are coming in from the WoodenBoat Forum. Finished up all the bottom stringers. Now that I know how to do
Stringing Along
Now that the stringers are in, they have to be faired to meet the planking. That led to one of those situations that if I was doing this professionally would lead straight to bankruptcy. As you can see, the under berth stringers basically stop right in the air — they are hooked to nothing at
Big Stringers are In
November 2, 2014 Hours spent building to date: 297 The big stringers that run fore-and-aft through the whole aft end of the boat are in after a lot of fitting and fiddling to get the “egg crate” slots all aligned. My friend Ray came to help with the installation, since they have to go