Month: November 2014

Done Stringing

November 23, 2014  Hours spent building to date:  372 Ray came over and we laminated the port stringers and aft sheer clamp in record time. I had hoped to have the   ready for planking (or sheathing I guess is more accurate) by Thanksgiving, but the forward part of the sheer clamp still has to

Read More

Topside Stringers

November 20, 2014  Hours spent building to date: 363 With fairing finished, time to return to some real boatbuilding — which in turn led to more fairing. The topside stringers are the long, thin members that provide a bonding surface for the topside planking.  They are curved for roughly the forward 15 feet of the

Read More

Motor Mount

November 15, 2014  Hours spent building to date:  338   The engine mount is attached to two more heavy stringers that run about five feet in from the transom and form the sides of the motor well.  They are 3/4-inch plywood, so the well assembly is 1 1/2-inches thick — pretty hefty to handle the

Read More

Routine Day

November 7, 2014  Hours spent building to date:  326 Nothing big to report — just a lot of the small jobs that lead to a big boat.  And a few tidbits for the followers that are coming in from the WoodenBoat Forum. Finished up all the bottom stringers.  Now that I know how to do

Read More

Stringing Along

Now that the stringers are in, they have to be faired to meet the planking.  That led to one of those situations that if I was doing this professionally would lead straight to bankruptcy. As you can see, the under berth stringers basically stop right in the air — they are hooked to nothing at

Read More

Big Stringers are In

November 2, 2014  Hours spent building to date:  297   The big stringers that run fore-and-aft through the whole aft end of the boat are in after a lot of fitting and fiddling to get the “egg crate” slots all aligned.  My friend Ray came to help with the installation, since they have to go

Read More