Small Jobs

December 31, 2016   Hours spent building to date:  3,202

running-lights-3

Over the holidays, I thought I would take on some jobs that could be done in two-to-three hour sessions, sandwiched in between other activities:

— Obviously,  wiring up the nav lights was one.  Connection was easy, but I had to send for some larger raceways, since there are now two sets of nav wires, two sets of speaker wires and a light wire running across the ceiling aft of the windshield.

— Sanding trim and taping is always a fun holiday activity, so over the course of several sessions I got it done and started building up the varnish with a sealer coat.

— The drawer fronts had been sealed, but needed final varnish build-up. I want to put on the hardware and start using them for storage on board, to cut down on trips up and down the ladder.

— I bought the anchor roller over a year ago to fit the platform it attaches to up at the bow.  And it’s been in the way ever since.  So I got the fastenings and did a dry fit.  Also dug out the 25-lb Delta anchor that will act as primary ground tackle and will always sit in the roller ready for use.  I bought it for Memsahib originally, but it went into storage when I completely redid her whole anchoring system to handle the strong tides and river currents we would experience during the Loop.  The 44-lb Delta I used on Memsabib never budged an inch, so I am very happy to have one for Tardis.  It fits like a glove.

Drawer-finishing factory

Drawer-finishing factory

Forecabin sanded and taped

Forecabin sanded and taped

Deckhouse sanded and taped

Deckhouse sanded and taped

Anchor roller dryfit

Anchor roller dryfit

Anchor fit test

Anchor fit test

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: